Products/3.Ingersoll-Rand-Air-Compressor-Cooler/29.Centac-Cooler-CV1/images/24c01d8cf99571474a17a6748a0b50bd_7979.webp
Products/3.Ingersoll-Rand-Air-Compressor-Cooler/29.Centac-Cooler-CV1/images/24c01d8cf99571474a17a6748a0b50bd_7979.webp

Centac Cooler CV1

Main Parameters

The Centac Cooler CV1 is a high-performance heat exchange solution designed for industrial air compression systems, delivering exceptional thermal management and energy efficiency.

Product Overview: Core Component of Efficient Heat Exchange Systems

The Centac Cooler CV1 serves as the critical heat exchange component for Ingersoll Rand Centac series centrifugal air compressors. Engineered for industrial compressed air systems, its primary function involves indirect heat exchange between cooling water and compressed air to effectively dissipate heat generated during compression.

Technical Architecture & Core Parameters

Feature Specification
Structural Design Double-pass shell and tube configuration (air through tubes, water through shell) with corrugated finned inner tubes
Material Composition CuNi alloy or pure copper tubes with stainless steel end caps/side panels
Heat Exchange Efficiency Cooling Temperature Difference (CTD) ≤5°C, pressure loss ≤0.05 MPa
Flow Capacity Compatible with Centac CV1 models (22-41 m³/min air flow), requiring 15-30 L/s cooling water

Technical Features: Precision Thermal Management Engineering

1. Advanced Heat Exchange Technology

The corrugated fin design increases air velocity to 12-15 m/s, enhancing turbulence by 30% and improving heat transfer coefficient by 25%. CuNi alloy tubes (90/10 or 70/30) demonstrate 3x better corrosion resistance in seawater or chlorinated cooling water environments.

2. Reliability & Maintenance

Fully welded construction reduces leakage risk to ≤0.1%. U-shaped tube bundles allow in-place cleaning within ≤2 hours. Optional dual cooling circuits maintain 80% capacity during single-loop failures.

3. Smart Control Integration

Integrated with Centac's C1000 microprocessor system for real-time monitoring of temperature, pressure and water quality parameters. Machine learning algorithms provide 14-day advance maintenance alerts.

Applications: Cross-Industry Thermal Solutions

1. Typical Implementation Scenarios

  • Chemical Processing: Maintains stable hydrogen compressor air temperatures for refinery hydrocracking units
  • Food & Beverage: Cools compressed air below 5°C to prevent condensation in sterile filling lines
  • Semiconductor: Delivers Class 0 oil-free air with ±1°C temperature stability for wafer etching

2. Case Studies

Industry Challenge Solution Results
Petrochemical 48hr annual downtime from seawater corrosion CuNi tubes with Heresite coating 15yr lifespan, 60% lower maintenance
Semiconductor 85% yield from temperature fluctuations Precision ±0.5°C control 98% yield, $2M annual savings

Maintenance Strategy: Lifecycle Optimization

1. Routine Procedures

Maintain cooling water parameters: ≤150ppm hardness, pH 6.5-8.5, ≤50ppm chlorides. Weekly leak checks with helium mass spectrometers.

2. Scheduled Maintenance

Bi-annual chemical cleaning (5% citric acid + 2% EDTA at 50°C). Annual mechanical cleaning with ≤20MPa water jets.

3. Troubleshooting

Symptom Probable Cause Corrective Action
Reduced cooling Tube fouling Initiate cleaning protocol
Leakage Seal degradation Replace fluorocarbon seals

Conclusion: Advancing Industrial Thermal Management

The Centac Cooler CV1 redefines industrial thermal standards through material innovation and smart control integration. Its combination of CuNi alloy construction, optimized fin geometry, and predictive maintenance capabilities positions it as essential infrastructure for modern manufacturing. As Industry 4.0 progresses, CV1's digital twin integration will further enhance reliability while reducing operational costs.

Share Article
Brand Name: Fete Vessel Design Standard: ASME, PED, CE
Place of Origin: China Condition: New
Warranty: 3 years Production standard: GB150.ASME.European standard.
What are your strengths?

Ans. Our strengths lie in our expertise in design and manufacturing.

What is your estimated delivery time?

Ans. The delivery time varies depending on the specific product. Typically, it ranges from 10 to 40 working days.

What are your primary product offerings?

Ans. Our primary product offerings include industrial heat exchangers, pressure vessel, air dryer.

How can I get in touch with you?

Ans. We are available 24/7 through TradeManager for immediate assistance. Alternatively, you can contact us via email, WhatsApp, Skype, or WeChat. Select one of our products and message us, and we will promptly respond.

What are your payment terms?

Ans. Our payment terms require a 50% TT deposit in advance, with the remaining 50% TT balance due before delivery. We also offer the option of utilizing Alibaba Trade Assurance Service. We welcome any additional suggestions or inquiries regarding payment methods.

Feel free to Ask questions

Related Products

Trusted partners

Trusted partners

We have collaborated with many well-known enterprises, contributing to their success and establishing a strong reputation as a trusted partner in the industry.

Atlas Copco logo
Kobelco logo
Wackerlogo
basf logo
fete vessel partners logo
TheLindeGroup-Logo
hitachi logo
foxconn logo
fusheng logo