Atlas Copco Compressor Cooler ZH15000
Main Parameters
Comprehensive technical specifications, performance data, and maintenance strategies for Fete Vessel's premium industrial cooling solution
1. Product Overview
The Atlas Copco Compressor Cooler ZH15000 is a specialized cooling unit designed by Atlas Copco for large industrial centrifugal air compressor systems, belonging to the ZH series centrifugal air compressor matching components. This product adopts modular water-cooled structure, specifically providing high-efficiency heat exchange solutions for air compression processes under high-load working conditions. Its core function is to transfer heat generated during compression from the compressed medium through circulating cooling water system, ensuring stable operation of the air compressor and extending the service life of key components.
Technical Background and Market Positioning
The ZH15000 cooler leverages Atlas Copco's technical expertise in centrifugal compressors, with optimized design for heavy industrial applications such as chemical, steel, and petrochemical industries. Its technical specifications strictly match the exhaust volume (5500-42500m³/h) and working pressure (1-13bar) of ZH series centrifugal machines (like ZH15000 main unit), ensuring overall system energy efficiency. Domestic suppliers including Wuxi Chaoke Refrigeration Equipment Co., Ltd. and Wuxi Blue Star Pressure Vessel Co., Ltd. produce through technical authorization, with products certified by ISO 9001 quality management system and compliant with industrial equipment reliability requirements.
2. Technical Features and Data Description
1. Structure and Heat Exchange Principle
- Double-pass baffle enhanced heat transfer: The cooler adopts shell-and-tube structure with cooling water flowing inside tubes while compressed air forms double-pass or four-pass flow between tubes through intermediate baffles, significantly improving heat exchange efficiency. Under typical parameters, its heat exchange area reaches 1200mm×930mm (Wuxi Blue Star product specifications), with heat transfer coefficient 15%-20% higher than conventional designs.
- Pressure and flow adaptability: Design pressure range covers 0.8-1.6MPa, supporting cooling requirements for compressed air with flow range 200-500m³/min. Water-side pressure loss ≤0.05MPa, air-side pressure loss ≤0.02MPa, ensuring system energy efficiency.
- Material and corrosion resistance: Main body material uses 304 stainless steel or nickel-plated carbon steel, tube bundle adopts high-frequency welded finned tubes, with temperature resistance range -20℃ to 150℃, suitable for circulating water environment with chloride ion concentration ≤50ppm, meeting requirements for coastal or chemical plant conditions.
2. Performance Parameters and Energy Efficiency Indicators
| Parameter Category | Technical Indicators | Typical Application Scenarios |
|---|---|---|
| Cooling Efficiency | ≥95% (ΔT=15℃) | Blast furnace air system in steel smelting |
| Water-side Flow Rate | 80-150m³/h | Air separation unit in petrochemical industry |
| Air-side Inlet Temperature | ≤120℃ (peak transient 150℃) | Compressed air system for glass melting furnace |
| Water-side Inlet Temperature | 25-35℃ | Sterile workshop in food & beverage industry |
| Cooling Water Quality Requirements | Conductivity ≤1500μS/cm, hardness ≤1.5mmol/L | Automobile painting workshop |
3. Intelligent Design and Compatibility
- Remote monitoring interface: Pre-configured Modbus RTU protocol interface, compatible with Atlas Elektronikon® control system, real-time monitoring of cooler inlet/outlet water temperature, pressure and flow, supporting fault warning and energy efficiency analysis.
- Modular expansion capability: Seamless integration with ZH series centrifugal machine's three-stage compression system, single cooler can adapt to 1-3 compression units, meeting phased capacity expansion needs.
- Redundancy design: Dual-circuit water path structure, maintaining over 70% cooling capacity during single tube bundle leakage, ensuring production continuity.
3. Application Scenarios and Case Studies
1. Core Application Fields
- Chemical process gas compression: In ethylene cracking units, ZH15000 cooler reduces cracked gas temperature from 120℃ to 40℃, preventing carbide deposition in subsequent compression process and reducing equipment maintenance frequency.
- Blast furnace air supply in steel smelting: A steel plant case shows after adopting this cooler, air compressor exhaust temperature decreased, motor load reduced, achieving annual electricity savings of 500,000kWh.
- Food-grade compressed air preparation: A dairy company configured ZH15000 cooler to reduce compressed air oil content below 0.01ppm, meeting sterile filling workshop requirements with significant improvement in product microbial indicators.
2. Typical Case Analysis
Case 1: Air separation unit renovation in petrochemical plant
- Problem: Original cooler caused air compressor exhaust temperature exceedance due to scaling blockage, triggering interlock shutdown.
- Solution: Replaced with ZH15000 cooler featuring double-pass baffle design, optimized water-side flow velocity, reduced cooling water circulation volume and system energy consumption.
- Result: Stable air compressor exhaust temperature after renovation, reduced annual maintenance cost and spare parts consumption.
Case 2: New energy vehicle battery production line
- Requirement: Compressed air must meet CLASS 0 oil-free standard with temperature fluctuation controlled within ±2℃.
- Configuration: ZH15000 cooler + stainless steel material + online cleaning device.
- Outcome: Stable compressed air dew point temperature, improved battery electrode coating yield, increased annual production capacity.
4. Maintenance Strategy
1. Routine Inspection and Preventive Maintenance
- Key parameter monitoring: Daily recording of cooling water inlet/outlet temperature, pressure difference and flow rate, establishing trend analysis model. When water-side pressure difference exceeds initial value, tube bundle endoscopy inspection required.
- Water quality management: Monthly testing of circulating water conductivity, pH value and hardness to ensure compliance. If hardness exceeds standard, softening treatment or scale inhibitor addition needed.
- Mechanical integrity check: Quarterly inspection of tube bundle vibration, ensuring support plate spacing meets design requirements, avoiding tube bundle fracture caused by resonance.
2. Fault Diagnosis and Emergency Handling
| Fault Phenomenon | Possible Causes | Solutions |
|---|---|---|
| Cooling efficiency decline | Tube bundle scaling, baffle blockage | Chemical cleaning (citric acid + corrosion inhibitor) or high-pressure water jet cleaning |
| Leakage | Tube bundle corrosion, sealing gasket aging | Replace damaged tube bundle or seals, local repair welding |
| Excessive water-side pressure loss | Tube bundle foreign matter blockage, uneven water distribution | Backflush operation or install online filtration device |
3. Shutdown Maintenance and Overhaul
- Annual overhaul content:
- Disassemble and inspect tube bundle corrosion condition, ultrasonic thickness measurement for wall thinning;
- Replace all sealing gaskets and bolt fasteners;
- Reapply anti-corrosion coating;
- Calibrate safety valves and pressure gauges.
- Spare parts management: Recommend stocking key spare parts including tube bundles, sealing gaskets, pressure sensors, with inventory cycle not exceeding 2 years.
5. Conclusion
The Atlas Copco Compressor Cooler ZH15000 has become a core component of compressed air systems in heavy industries due to its efficient heat exchange performance, rigorous industrial-grade design and intelligent management capabilities. Through digital parameter management, typical scenario verification and preventive maintenance strategies, this product can significantly improve user production efficiency and reduce lifecycle costs. With the advancement of Industry 4.0 and dual-carbon goals, the ZH15000 cooler will further integrate intelligent predictive maintenance functions, providing more sustainable solutions for energy-intensive industries.
| Brand Name: | Fete Vessel | Design Standard: | ASME, PED, CE |
|---|---|---|---|
| Place of Origin: | China | Condition: | New |
| Warranty: | 3 years | Production standard: | GB150.ASME.European standard. |
What are your strengths?
Ans. Our strengths lie in our expertise in design and manufacturing.
What is your estimated delivery time?
Ans. The delivery time varies depending on the specific product. Typically, it ranges from 10 to 40 working days.
What are your primary product offerings?
Ans. Our primary product offerings include industrial heat exchangers, pressure vessel, air dryer.
How can I get in touch with you?
Ans. We are available 24/7 through TradeManager for immediate assistance. Alternatively, you can contact us via email, WhatsApp, Skype, or WeChat. Select one of our products and message us, and we will promptly respond.
What are your payment terms?
Ans. Our payment terms require a 50% TT deposit in advance, with the remaining 50% TT balance due before delivery. We also offer the option of utilizing Alibaba Trade Assurance Service. We welcome any additional suggestions or inquiries regarding payment methods.
Feel free to Ask questions
Trusted partners
We have collaborated with many well-known enterprises, contributing to their success and establishing a strong reputation as a trusted partner in the industry.