Products/6.FS-Elliott-Compressor-Cooler/1.FS-Elliott-Compressor-AfterCooler/images/438cd9ffbd7322e01fbcf582df6bcc55_8591.webp
Products/6.FS-Elliott-Compressor-Cooler/1.FS-Elliott-Compressor-AfterCooler/images/f4fce1204f17bacbdf0662f9c5f8ffcb_9651.webp
Products/6.FS-Elliott-Compressor-Cooler/1.FS-Elliott-Compressor-AfterCooler/images/438cd9ffbd7322e01fbcf582df6bcc55_8591.webp
Products/6.FS-Elliott-Compressor-Cooler/1.FS-Elliott-Compressor-AfterCooler/images/f4fce1204f17bacbdf0662f9c5f8ffcb_9651.webp

FS-Elliott Compressor AfterCooler

Main Parameters

Comprehensive technical specifications and implementation strategies for Fete Vessel's premium centrifugal compressor cooling systems.

1. Product Overview: Core Temperature Control Unit for Centrifugal Compressor Systems

The FS-Elliott Compressor AfterCooler (abbreviated as "FSE-AC") is a specialized post-cooler designed for centrifugal air compressors, serving as a critical heat exchange component in industrial compressed air systems.

Key Functional Dimensions:

  • Heat Energy Conversion: Cools compressed air from compressor outlet temperatures up to 180°C down to process-required levels
  • Liquid-Gas Separation: Removes over 90% of water vapor and oil mist through condensation
  • Energy Efficiency Optimization: Improves dehumidification efficiency in downstream equipment by 15-20%
  • 2. Technical Features and Data Specifications

    2.1 Heat Exchange Efficiency Optimization

    Innovative tube bundle design using 14mm×1mm corrugated copper tubes increases heat transfer coefficient by 25% compared to conventional smooth tubes.

    Parameter FSE-AC Specification Industry Standard Maximum Working Pressure 16barg (232psi) 10-12barg Cooling Water Flow 5-30m³/h (tube side) 8-25m³/h Pressure Drop Control ≤0.03MPa (full load) 0.05-0.08MPa

    3. Application Scenarios and Case Studies

    3.1 Core Application Fields

    FSE-AC systems demonstrate exceptional performance in semiconductor manufacturing, pharmaceutical production, and new energy battery fabrication.

    3.2 Representative Case Analysis

    Case 1: Multinational chemical plant achieved 480万元 annual economic benefits after upgrading to FSE-AC system.

    4. Maintenance Strategy

    4.1 Preventive Maintenance System

    Three-tier maintenance protocol ensures optimal performance throughout the equipment lifecycle.

    5. Conclusion: Temperature Control Benchmark in Industry 4.0 Era

    FS-Elliott Compressor AfterCooler redefines technical standards for centrifugal compressor cooling systems through material innovation and intelligent control integration.

    Share Article
    Brand Name:Fete VesselDesign Standard:ASME, PED, CE
    Place of Origin:ChinaCondition:New
    Warranty:3 yearsProduction standard:GB150.ASME.European standard.

    What are your strengths?

    Ans. Our strengths lie in our expertise in design and manufacturing.

    What is your estimated delivery time?

    Ans. The delivery time varies depending on the specific product. Typically, it ranges from 10 to 40 working days.

    What are your primary product offerings?

    Ans. Our primary product offerings include industrial heat exchangers, pressure vessel, air dryer.

    How can I get in touch with you?

    Ans. We are available 24/7 through TradeManager for immediate assistance. Alternatively, you can contact us via email, WhatsApp, Skype, or WeChat. Select one of our products and message us, and we will promptly respond.

    What are your payment terms?

    Ans. Our payment terms require a 50% TT deposit in advance, with the remaining 50% TT balance due before delivery. We also offer the option of utilizing Alibaba Trade Assurance Service. We welcome any additional suggestions or inquiries regarding payment methods.

    Feel free to Ask questions

    Replacement support

    FS-Elliott Compressor AfterCooler selection and replacement support

    Fete Vessel supports engineers and purchasing teams who need a reliable replacement for FS-Elliott Compressor AfterCooler. Share the compressor model, cooler dimensions, drawings, operating pressure, temperature, medium, and old part photos, and our team will compare the details before recommending a suitable manufacturing plan.

    Fit and drawings

    We review cooler dimensions, nozzle position, mounting size, drawings, old part photos, and site installation details.

    Material and test

    Each order can be checked for material, tube bundle layout, pressure test requirements, coating, packing, and delivery schedule.

    Repair or replace

    For urgent maintenance projects, we can help check whether an existing cooler can be repaired, retubed, or replaced.

    Related Products

    Trusted partners

    Trusted partners

    We have collaborated with many well-known enterprises, contributing to their success and establishing a strong reputation as a trusted partner in the industry.

    Atlas Copco logo
    Kobelco logo
    Wackerlogo
    basf logo
    fete vessel partners logo
    TheLindeGroup-Logo
    hitachi logo
    foxconn logo
    fusheng logo